India Rooftop Solar Utility Directory (2026)
DISCOM Solar Net-Metering Rules & Regulations
Find out how much solar capacity your electricity board permits, technical feasibility limits, and required paperwork before applying.
Instant Feasibility Checker
Check Your Permissible Solar Capacity
Select your DISCOM and sanctioned load to check maximum allowable solar plant size.
Load:kW
Max Solar Allowed
3 kWp
100% of sanctioned load
Metering Type
Net Metering
Bi-directional Smart Meter
Grid Connection
LT Connection
Low Tension up to 150 kW
Avg. Approval Time
~21 Days
From portal application
All Electricity Boards (14)
Select any utility to review state-specific net-metering policies.
Maharashtra
PM Surya Ghar Integrated
Maharashtra State Electricity Distribution Co. Ltd.
MSEDCL (Mahavitaran)
Max Permitted Load
100% of Load
Turnaround Time
~21 Days
Key Regulations:
- •Up to 100% of sanctioned load permitted for net metering.
- •Annual energy settlement cycle ends in March with banking credits.
- •Fully integrated with the PM Surya Ghar National Portal for DBT subsidies.
Documents Needed:
Latest MSEDCL electricity bill with paid receiptProperty ownership deed / Index-II / Tax receiptAadhaar card of consumer & passport size photographDCR module certificate & inverter manufacturer test report
Maharashtra
PM Surya Ghar Integrated
Tata Power Company Ltd. (Mumbai Distribution)
Tata Power Mumbai
Max Permitted Load
100% of Load
Turnaround Time
~15 Days
Key Regulations:
- •Fast digital processing within 15 working days.
- •Net metering available for all residential and institutional categories.
Documents Needed:
Electricity billIdentity proofSite single-line diagram (SLD)
Maharashtra
PM Surya Ghar Integrated
Adani Electricity Mumbai Ltd.
Adani Electricity Mumbai
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
- •Rapid digital net-meter installation.
- •Zero application fees for residential rooftop systems under PM Surya Ghar.
Documents Needed:
Latest billNOC from building society (for apartments)Inverter test cert
Gujarat
PM Surya Ghar Integrated
Dakshin Gujarat Vij Company Ltd.
DGVCL
Max Permitted Load
80% of Load
Turnaround Time
~18 Days
Key Regulations:
- •Gujarat Solar Power Policy: Up to 80% of sanctioned load for LT consumers.
- •Surplus injection credited at ₹2.25/unit for residential systems.
- •Seamless digital workflow through GUVNL portal.
Documents Needed:
Electricity billMunicipal tax bill / 7-12 utaraAadhaar card
Gujarat
PM Surya Ghar Integrated
Torrent Power Ltd. (Ahmedabad, Gandhinagar, Surat)
Torrent Power
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
- •Allows up to 100% of sanctioned load for residential consumers.
- •Fast-track bi-directional smart meter installation.
Documents Needed:
Electricity billAadhaarWork completion report
Delhi
PM Surya Ghar Integrated
BSES Rajdhani Power Ltd.
BSES Rajdhani (BRPL)
Max Permitted Load
100% of Load
Turnaround Time
~15 Days
Key Regulations:
- •Delhi Solar Policy: Generation-Based Incentive (GBI) of ₹3.00/unit for residential.
- •No height restriction on solar structures up to 2 meters for rooftop clearance.
- •Up to 100% of sanctioned load permitted.
Documents Needed:
CA number billOwnership documentAadhaar cardSite SLD
Delhi
PM Surya Ghar Integrated
Tata Power Delhi Distribution Ltd.
Tata Power DDL (TPDDL)
Max Permitted Load
100% of Load
Turnaround Time
~14 Days
Key Regulations:
- •Fully digital end-to-end net metering within 14 days.
- •Delhi GBI subsidy benefits credited directly on monthly bill.
Documents Needed:
Electricity billIdentity proofInverter serials
Karnataka
PM Surya Ghar Integrated
Bangalore Electricity Supply Company Ltd.
BESCOM
Max Permitted Load
100% of Load
Turnaround Time
~25 Days
Key Regulations:
- •KERC Solar Regulations: Net metering up to 100% of sanctioned load.
- •Residential LT limit typically up to 50 kW.
- •Energy settlement banking on monthly basis.
Documents Needed:
Account ID billKhata certificate / title deedInverter test cert
Rajasthan
PM Surya Ghar Integrated
Jaipur Vidyut Vitran Nigam Ltd.
JVVNL (Jaipur Discom)
Max Permitted Load
80% of Load
Turnaround Time
~21 Days
Key Regulations:
- •Rajasthan Rooftop Solar Regulations: 80% cap on sanctioned load.
- •Highest solar irradiance in India (~5.5 kWh/m²/day).
Documents Needed:
K-number electricity billAadhaarRegistry / Jamabandi
Tamil Nadu
PM Surya Ghar Integrated
Tamil Nadu Generation and Distribution Corporation Ltd.
TANGEDCO
Max Permitted Load
100% of Load
Turnaround Time
~30 Days
Key Regulations:
- •TNERC Solar Net Feed-in & Net Metering Framework.
- •Network service charges apply on gross generation for non-domestic.
- •100% PM Surya Ghar subsidy disbursement on National Portal.
Documents Needed:
Consumer number billProperty tax receiptSingle Line Diagram
Uttar Pradesh
PM Surya Ghar Integrated
Paschimanchal Vidyut Vitran Nigam Ltd. (Noida, Meerut)
PVVNL
Max Permitted Load
75% of Load
Turnaround Time
~25 Days
Key Regulations:
- •UPERC Solar Policy: Up to 75% of sanctioned load for residential net metering.
- •State subsidy top-up of ₹15,000 to ₹30,000 under UP Solar Energy Policy.
Documents Needed:
UPPCL Account number billAadhaarSite photograph
Haryana
PM Surya Ghar Integrated
Dakshin Haryana Bijli Vitran Nigam
DHBVN (Gurugram, Faridabad)
Max Permitted Load
100% of Load
Turnaround Time
~20 Days
Key Regulations:
- •HERC Net Metering: Mandatory for residential plots 500 sq. yards and above.
- •Up to 100% of connected load allowed.
Documents Needed:
Electricity billPlot registry documentCEA safety certificate
Telangana
PM Surya Ghar Integrated
Southern Power Distribution Company of Telangana Ltd.
TSSPDCL (Hyderabad)
Max Permitted Load
100% of Load
Turnaround Time
~21 Days
Key Regulations:
- •Allows up to 100% of contracted load.
- •Dedicated single-window clearance for net meter inspection.
Documents Needed:
USC number billProperty ownership proofInverter datasheet
Punjab
PM Surya Ghar Integrated
Punjab State Power Corporation Ltd.
PSPCL
Max Permitted Load
80% of Load
Turnaround Time
~25 Days
Key Regulations:
- •PSERC Rooftop Regulations: Net metering up to 80% sanctioned load.
- •Settlement of surplus injection on annual billing cycle.
Documents Needed:
Electricity account billAadhaarContractor installation certificate