Solset AISolset AI
Demos
Pricing

Solar project management software

Can this job start on Thursday?

Is the material here, is a crew free, may the stage move, and what happened on site today. Four questions the board answers before anybody drives out.

7 days free, card required Cancel any time before day 7
app.solset.ai/operations/materials
Greenfield Foods — Unit 2
P-100087

Ordered and received against this project

Modules 585 W52 nos0%
Inverter 30 kW1 no0%
Structure steel2,450 kg0%
DC cable & BOS1 lot0%
Not ready to startsteel 60% received

Read from the purchase orders and goods receipts you already raised — free warehouse stock is shown beside it as context, never counted as coverage.

Starter
plan site surveys and field reports start on
Professional
plan projects, crews and material readiness start on
Growth
plan multiple warehouses start on
5
grid-connection stages per project, yours to rename
01 · Material

Know before the crew arrives, not after.

What each job needs, what was ordered for it and what actually arrived, joined on one screen.

Greenfield Foods, Unit 2

Received against this project’s bill of materials

Modules 585 W52 of 52
Inverter 30 kW1 of 1
Mounting structure1,440 kg of 2,400 kg
DC cable 6 mm²0 m of 400 m

650 m free in the warehouse, shown as context, not counted as received.

Not ready to start: 2 of 4 lines short.

From request to paid bill

1Request
2Approved
3PO sent
4Received
5Bill matched
Per line, per projectOne over-delivered item cannot hide another that never arrived.
Free stock is context, not coverageTwo projects cannot both look ready on the same forty modules.
Three-way matched before it is paidBill against order and goods receipt; differences are named.
Inventory is quantities across as many warehouses as you run, with every movement carrying its reason and its reference. It does not track lot, batch or panel serial numbers. If you need a module's serial against a warranty claim today, that is not something this does yet.
02 · Crews and stages

Who is on which roof. And whether the job may move.

A week of crews by day, and a board built from the stages your business actually runs.

Booked, or double-booked

Week of 14 October · 3 crews · 12 booked crew-days

MTWTFS
Crew A
Crew B
Crew C
Crew A is on two sites on Thursday. Saved anyway, and flagged so somebody decides.
  • Free on Thursday? A glance, not three phone calls.
  • A clash warns, it never refuses. A split crew is sometimes exactly what you meant.

The board

Your stages · 2 to 8 of them, renamed any time

SurveyHarbor Logistics
MaterialGreenfield FoodsNorthside School
InstallLakeview Clinic
CommissionWestpark Mall

Lakeview Clinic has 2 checklist tasks open: earthing test, roof sign-off.

Move anywayKeep it here
  • Your stages, not ours. Before you change them, it shows how many projects would move.
  • Every move is stamped, so time-in-stage is a real number later.
03 · From the site, and after

The update lands on the record. The record outlives the job.

Not in a group chat that scrolls away by Friday. What the crew records during the install is what the service engineer opens in year nine.

Daily site update

Filled in from a phone before the crew leaves

Greenfield Foods · Day 3 5 on site

Rails on rows 1 to 4, 28 modules mounted. DC strings tomorrow.

Blocking tomorrow: 960 kg of structure still on the truck.

  • The survey, with measurements, shade notes and photos, against the project.
  • Progress from closed tasks. Nobody types a percentage, so 90% done means 90% of the work is closed.
Everything here runs in a mobile browser. On Android the Solset AI app is live on Google Play; the iPhone app is not published yet, so iPhone users work in the browser.

Handover and after

The job ends; the record does not

Commissioning checklist

  • Earthing resistance measured
  • Inverter commissioned
  • String voltages recorded
  • Customer walkthrough
Certificate generates when every item is ticked (3 of 4)
Maintenance that books itselfCleaning, inverter checks and the annual review raise their own visits on schedule.
Where the time goesAverage time per stage, the stage that holds jobs up most, and anything stuck for a fortnight.
Cycle-time figures start from the day stage history was switched on for your workspace. There is nothing to reconstruct them from before that, so an early gap is unknown rather than zero.
04 · Grid connection

How long has it been sitting there?

Every utility application, with how long it has waited in its stage. The late ones sit at the top, where somebody will ring about them.

  • The reference lives on the project, and each stage is dated when you advance it, so the screen and the chase-up email show the same number.
  • No recorded start date means no clock, rather than a made-up one.
The day counts are indicative defaults, not a statutory SLA. Every utility has its own process, so the stages and their expected days are yours to rename and change. Workspaces in Australia, India and Saudi Arabia start from their utility's own stages.

Utility interconnection

Grid-connection applications

Not startedno clock
Application submitted36d / 30d
Approved21d expected
Inspection14d expected
Permission to operateno clock

Waiting 36 days on the application, 6 over. Chase it.

Common questions

What operations teams ask first

Including the one we answer with a plain no, because finding it out after switching is worse.

Solset AI in your country

The same features everywhere. Each country site shows the tax, documents, units and prices set up there.

Field to office

Every job, with one honest status.

Stop chasing updates across three group chats and a spreadsheet. Put the next installation on a record the whole team reads the same way.