Solar project management software
Can this job start on Thursday?
Is the material here, is a crew free, may the stage move, and what happened on site today. Four questions the board answers before anybody drives out.
Ordered and received against this project
Read from the purchase orders and goods receipts you already raised — free warehouse stock is shown beside it as context, never counted as coverage.
- Starter
- plan site surveys and field reports start on
- Professional
- plan projects, crews and material readiness start on
- Growth
- plan multiple warehouses start on
- 5
- grid-connection stages per project, yours to rename
Four questions before anybody drives out
Know before the crew arrives, not after.
What each job needs, what was ordered for it and what actually arrived, joined on one screen.
Greenfield Foods, Unit 2
Received against this project’s bill of materials
650 m free in the warehouse, shown as context, not counted as received.
From request to paid bill
Who is on which roof. And whether the job may move.
A week of crews by day, and a board built from the stages your business actually runs.
Booked, or double-booked
Week of 14 October · 3 crews · 12 booked crew-days
- Free on Thursday? A glance, not three phone calls.
- A clash warns, it never refuses. A split crew is sometimes exactly what you meant.
The board
Your stages · 2 to 8 of them, renamed any time
Lakeview Clinic has 2 checklist tasks open: earthing test, roof sign-off.
- Your stages, not ours. Before you change them, it shows how many projects would move.
- Every move is stamped, so time-in-stage is a real number later.
The update lands on the record. The record outlives the job.
Not in a group chat that scrolls away by Friday. What the crew records during the install is what the service engineer opens in year nine.
Daily site update
Filled in from a phone before the crew leaves
Rails on rows 1 to 4, 28 modules mounted. DC strings tomorrow.
Blocking tomorrow: 960 kg of structure still on the truck.
- The survey, with measurements, shade notes and photos, against the project.
- Progress from closed tasks. Nobody types a percentage, so 90% done means 90% of the work is closed.
Handover and after
The job ends; the record does not
Commissioning checklist
- Earthing resistance measured
- Inverter commissioned
- String voltages recorded
- Customer walkthrough
How long has it been sitting there?
Every utility application, with how long it has waited in its stage. The late ones sit at the top, where somebody will ring about them.
- The reference lives on the project, and each stage is dated when you advance it, so the screen and the chase-up email show the same number.
- No recorded start date means no clock, rather than a made-up one.
Utility interconnection
Grid-connection applications
Waiting 36 days on the application, 6 over. Chase it.
Explore more of the platform
What operations teams ask first
Including the one we answer with a plain no, because finding it out after switching is worse.
Feature by feature
Each page shows how the feature works, what comes out of it, what it does not do and which plan it starts on.
Guides on this topic
- Solar project management and BOM controlKeeping materials, stages and costs on one record
- Mobile site survey checklistsWhat field crews should capture on the first visit
- Net metering process in IndiaThe DISCOM steps, documents and waiting times
- Managing solar AMCs and O&M contractsTurning service visits into predictable revenue
Solset AI in your country
The same features everywhere. Each country site shows the tax, documents, units and prices set up there.
Every job, with one honest status.
Stop chasing updates across three group chats and a spreadsheet. Put the next installation on a record the whole team reads the same way.