Solset AISolset AI
Marketplace
Pricing
Log inGet Started

Features

All FeaturesDesign StudioMarketing & SalesOperationsFinanceIntelligenceProduct Demos

Solutions

ResidentialCommercialIndustrial
Marketplace

Free Tools

Know Your QuoteAI Bill ScannerSolar Loan CalculatorC&I Solar ROIDISCOM Directory
Pricing

Company

About UsCareersHow It WorksRoadmapContact Us
Log inGet Started Free
All articlesCompliance

The PM Surya Ghar Subsidy Is Paid in Slabs, Not a Percentage — Here Is How That Trips Up Calculators

August 30, 2026 8 min read

PM Surya Ghar: Muft Bijli Yojana is the single biggest driver of India's residential rooftop solar demand today, and the subsidy amount it pays is the number every customer asks about first. It is also, surprisingly often, the number online calculators and installer quote tools get wrong — not by a rounding error, but by using the wrong formula entirely.

What the scheme actually pays

The Central Financial Assistance under PM Surya Ghar is paid in fixed slabs, not as a share of system cost: ₹30,000 per kW for the first 2 kW of system capacity, ₹18,000 per kW for the third kilowatt, and a hard cap of ₹78,000 for any residential system 3 kW or larger. A 1 kW system gets ₹30,000. A 2 kW system gets ₹60,000. A 2.72 kWp system — a very common real-world size, since panel wattages rarely divide evenly into whole kilowatts — gets the pro-rated third-kilowatt rate on top of the first two, working out to roughly ₹72,960. Nothing above 3 kW changes the subsidy; it stays capped at ₹78,000 regardless of whether the system is 3 kW or 10 kW. Group housing and RWA installations follow a separate schedule entirely — ₹18,000 per kW up to 500 kW collectively — and should never be quoted against the residential cap.

Why a percentage-based calculator seems reasonable, and isn't

It is easy to see how a percentage shortcut gets built: take a typical cost-per-kWp figure, apply something like "30% subsidy," and the output looks plausible on a demo. The problem shows up the moment the tenant's own price-per-kWp setting differs even slightly from whatever number the calculator was built against — because a percentage of system cost tracks the *installer's price*, not the *government's slab table*. Raise your price and, under a percentage model, the "subsidy" appears to go up with it. That is backwards: the subsidy is a fixed number set by the scheme, entirely independent of what any individual installer charges.

What gets wrong, and in which direction

  • At the small end (1–2 kW), a percentage-of-cost model built around a lower assumed price per kWp routinely under-quotes the subsidy by tens of thousands of rupees against what the household is actually owed.
  • At the large end (a 10 kW-plus system, common in bigger homes), the same percentage model can over-quote the subsidy substantially, because it never respects the ₹78,000 cap — the cap is the whole point of the scheme's design, and a percentage formula has no way to express a hard ceiling.
  • Because the error direction flips depending on system size, there is no single "correction factor" that fixes a percentage-based calculator — the fix is to stop using a percentage at all and implement the actual slab table.

What an accurate calculation actually requires

A correct subsidy figure needs exactly three things: the fixed per-kW rate for the first 2 kW, the pro-rated rate for the third kilowatt (since real systems rarely land on a whole number), and a hard cap applied after both are summed. None of that depends on the price the installer is charging — the subsidy calculation and the pricing calculation are two entirely separate pieces of arithmetic, and a platform that lets a tenant's own pricing setting quietly influence the government's number has a structural bug, not a cosmetic one.

Solset AI's Design Studio and its free public subsidy calculator compute the subsidy from the real slab table — one shared piece of logic used everywhere the number is shown, so a residential quote, a design report, and the calculator itself can never quietly disagree with each other. For the fuller walkthrough of the scheme's disbursal timelines, application volumes, and where installer-side applications typically stall, see our complete PM Surya Ghar guide for EPCs.

See Solset AI for your solar business

Start free in 30 minutes. No card, no catch.

Get Started Free

Keep reading

Net Metering Process in India: A Step-by-Step Guide for Solar Installers

Net metering approval is the single biggest source of project delays for Indian solar installers. Here is what actually happens between application and commissioning, and how to keep it moving.

PM Surya Ghar Yojana 2026: The Complete Guide for Solar EPCs

The scheme has moved 31+ lakh households onto rooftop solar and the portal has finally stabilized — but EPCs that get the application details wrong still watch subsidies stall for months.

Solset AISolset AI

The complete management platform for solar companies in India — leads, projects, inventory, WhatsApp & service in one place.

🇮🇳 Made in India for the World

Product

  • Features
  • How It Works
  • Pricing
  • Roadmap
  • Blog

Solutions

  • Residential
  • Commercial
  • Industrial
  • AI Intelligence
  • Finance

Compare & Guides

  • Solar CRM India
  • Solar EPC Software
  • Project Management
  • Solset vs Zoho
  • Solset vs HubSpot
  • Solset vs Spreadsheets

Company

  • About Us
  • Careers
  • Contact Us
  • Request Demo

Legal

  • Sign In
  • Privacy Policy
  • Refund Policy
  • Terms of Service

Free Solar Tools & Calculators

AI Bill ScannerSolar Loan & EMI CalculatorCommercial Solar & Tax ROIDISCOM Net-Metering DirectoryPM Surya Ghar SubsidyKnow Your QuoteQuote ComparisonBuild Your Quote

Solar CRM by State

GujaratMaharashtraRajasthanTamil NaduKarnatakaUttar PradeshPunjabHaryanaCaliforniaTexasFloridaNew YorkArizonaNevadaColorado

© 2026 Solset Technologies Pvt Ltd · All rights reserved

CRM for Solar · Solar EPC Software · Solar Lead Management